Each community is completely different, which CBS proved immediately with the discharge of their fall 2024 schedule.
Whereas we TV Fanatics are wanting to return to the exhibits we love, equivalent to Elsbeth, Blue Bloods, NCIS, and the FBI exhibits, CBS desires us to salivate just a bit bit longer.
It’s not our favourite factor, however possibly it can imply fewer hiatuses in order that we will savor our exhibits as they have been supposed to be considered — with little interruption. Hey, we will dream, proper?
![Over The Bar - Tracker Season 1 Episode 8](https://cdn.tvfanatic.com/uploads/2024/04/over-the-bar-tracker-season-1-episode-8-1024x576.jpg)
![Over The Bar - Tracker Season 1 Episode 8](https://cdn.tvfanatic.com/uploads/2024/04/over-the-bar-tracker-season-1-episode-8.jpg)
CBS immediately introduced fall premiere dates for its 5 new and 15 returning sequence for the 2024-25 primetime schedule.
The official “CBS PREMIERE WEEK” kicks off with a full week of authentic episodes starting Monday, Oct. 14, with the twenty second season premiere of NCIS and two hours of the brand new drama NCIS: ORIGINS starring Austin Stowell as a younger Leroy Jethro Gibbs and narrated by Mark Harmon.
Associated: NCIS: Origins – Every part We Know So Far
The autumn lineup consists of two particular “Sneak Peeks” previous to CBS PREMIERE WEEK.
The brand new Thursday evening drama sequence Matlock, starring Kathy Bates, will debut on Sunday, September 22 (8/7c). It should have a powerful lead-in from the 57th season premiere of 60 Minutes.
![Matlock Pops Her Head In](https://cdn.tvfanatic.com/uploads/2024/06/matlock-pops-her-head-in-721x1024.jpg)
![Matlock Pops Her Head In](https://cdn.tvfanatic.com/uploads/2024/06/matlock-pops-her-head-in.jpg)
And the brand new Wednesday evening action-adventure actuality competitors sequence The Summit, set within the New Zealand Alps and hosted by Manu Bennett, on Sunday, September 29 (9:00-10:30 PM, ET; 8:30-10:00 PM, PT) with a strong lead in following an NFL ON CBS doubleheader and an authentic 60 Minutes.
As well as, the hit actuality sequence Survivor debuts its 47th season with a two-hour episode on Wednesday, September 18 (8/7c), and Blue Bloods returns in CBS Premiere Week for its 14th and last season on Friday, October 18 (9/8c). TV’s #1 sequence Tracker returns Sunday, October 27.
The next is the “Sneak Peeks” and CBS Premieres Schedule, paying explicit consideration to the timing of assorted occasions that begin at completely different time blocks by time zone:
(**All occasions are ET/PT except famous).
WEDNESDAY, SEPTEMBER 18
8:00-10:00 PM
SURVIVOR (forty seventh season premiere)
*Common 8:00-9:30 PM timeslot begins Wednesday, September 25.
![Reef Madness - 4 - NCIS](https://cdn.tvfanatic.com/uploads/2024/07/reef-madness-4-ncis-576x1024.jpg)
![Reef Madness - 4 - NCIS](https://cdn.tvfanatic.com/uploads/2024/07/reef-madness-4-ncis.jpg)
SATURDAY, SEPTEMBER 21
9:00-11:00 PM — 48 HOURS (thirty seventh season premiere)
*Common 10:00-11:00 PM timeslot begins Saturday, September 28.
Associated: Matlock Season 1 – Every part We Know So Far
SUNDAY, SEPTEMBER 22
7:00-8:00 PM — 60 MINUTES (57th season premiere)
8:00-9:00 PM — MATLOCK (Sneak Peek)
*Common 9:00-10:00 PM Thursday timeslot begins October 17
![Jeff & The Necklace - Survivor Season 41 Episode 13](https://cdn.tvfanatic.com/uploads/2021/12/jeff-and-the-necklace-survivor-s41e13.jpg)
![Jeff & The Necklace - Survivor Season 41 Episode 13](https://cdn.tvfanatic.com/uploads/2021/12/jeff-and-the-necklace-survivor-s41e13.jpg)
SUNDAY, SEPTEMBER 29
7:00-7:30 PM, ET — NFL ON CBS doubleheader
7:30-9:00 PM, ET / 7:00-8:30 PM, PT — 60 MINUTES *90-minute episode
9:00-10:30 PM, ET / 8:30-10:00 PM, PT — THE SUMMIT (Sneak Peek)
*Common 9:30-11:00 PM Wednesday timeslot begins October 16.
10:30-11:30 PM, ET / 10:00-11:00 PM, PT — BIG BROTHER (authentic episode)
WEDNESDAY, OCTOBER 9
8:00-9:30 PM — SURVIVOR
9:30-11:00 PM — THE SUMMIT (encore of the primary episode)
![Elsbeth in pink hat - Elsbeth Season 1 Episode 10 - A Fitting Finale](https://cdn.tvfanatic.com/uploads/2024/05/elsbeth-in-pink-hat-elsbeth-season-1-episode-10-a-fitting-finale-576x1024.jpg)
![Elsbeth in pink hat - Elsbeth Season 1 Episode 10 - A Fitting Finale](https://cdn.tvfanatic.com/uploads/2024/05/elsbeth-in-pink-hat-elsbeth-season-1-episode-10-a-fitting-finale.jpg)
THURSDAY, OCTOBER 10
8:00-9:00 PM — BIG BROTHER (authentic episode)
9:00-10:00 PM — MATLOCK (encore of first episode)
10:00-11:00 PM — ELSBETH (rebroadcast)
Associated: Elsbeth Season 1 Report Card: Swift, Floral, and Entertaining Justice
SUNDAY, OCTOBER 13
7:00-8:30 PM — 60 MINUTES
*90-minute episode
8:30-10:00 PM — BIG BROTHER (season finale)
![NCIS Origins Key Art](https://cdn.tvfanatic.com/uploads/2024/07/UF24_NCISO_V02_1920x1080_041824-1024x576.jpg)
![NCIS Origins Key Art](https://cdn.tvfanatic.com/uploads/2024/07/UF24_NCISO_V02_1920x1080_041824.jpg)
CBS PREMIERE WEEK
MONDAY, OCTOBER 14
8:00-9:00 PM — NCIS (twenty second season premiere)
*Common 9:00-10:00 PM timeslot begins Monday, Oct. 21.
9:00-11:00 PM — NCIS: ORIGINS (sequence premiere)
*Common 10:00-11:00 PM timeslot begins Monday, Oct. 21.
TUESDAY, OCTOBER 15
8:00-9:00 PM — FBI (seventh season premiere)
9:00-10:00 PM — FBI: INTERNATIONAL (fourth season premiere)
10:00-11:00 PM — FBI: MOST WANTED (sixth season premiere)
![Terrorists Resurface - FBI Season 6 Episode 13](https://cdn.tvfanatic.com/uploads/2024/05/terrorists-resurface-fbi-s6e13-683x1024.jpg)
![Terrorists Resurface - FBI Season 6 Episode 13](https://cdn.tvfanatic.com/uploads/2024/05/terrorists-resurface-fbi-s6e13.jpg)
WEDNESDAY, OCTOBER 16
8:00-9:30 PM — SURVIVOR
9:30-11:00 PM — THE SUMMIT (second episode)
Associated: Tracker Season 2 – Every part We Know So Far
THURSDAY, OCTOBER 17
8:00-8:30 PM — GEORGIE & MANDY’S FIRST MARRIAGE (sequence premiere)
8:30-9:00 PM — GHOSTS (fourth season premiere)
9:00-10:00 PM — MATLOCK (second episode)
10:00-11:00 PM — ELSBETH (second season premiere)
![Manny and Bode walk away from the accident scene - Fire Country Season 2 Episode 7](https://cdn.tvfanatic.com/uploads/2024/04/manny-and-bode-walk-away-from-the-accident-scene-fire-country-s2.jpg)
![Manny and Bode walk away from the accident scene - Fire Country Season 2 Episode 7](https://cdn.tvfanatic.com/uploads/2024/04/manny-and-bode-walk-away-from-the-accident-scene-fire-country-s2.jpg)
FRIDAY, OCTOBER 18
8:00-9:00 PM — S.W.A.T. (eighth season premiere)
9:00-10:00 PM — FIRE COUNTRY (third season premiere)
10:00-11:00 PM — BLUE BLOODS (Return of remaining episodes of 14th last season)
MONDAY, OCTOBER 21
8:00-8:30 PM — THE NEIGHBORHOOD (seventh season premiere)
8:30-9:00 PM — POPPA’S HOUSE (sequence premiere)
9:00-10:00 PM — NCIS
10:00-11:00 PM — NCIS: ORIGINS
![Damon Wayans Jr. - Poppa's House - 2024 - CBS](https://cdn.tvfanatic.com/uploads/2024/06/damon-wayans-jr-poppas-house-2024-cbs-576x1024.jpg)
![Damon Wayans Jr. - Poppa's House - 2024 - CBS](https://cdn.tvfanatic.com/uploads/2024/06/damon-wayans-jr-poppas-house-2024-cbs.jpg)
SUNDAY, OCTOBER 27
7:00-7:30 PM, ET — NFL ON CBS doubleheader
7:30-8:30 PM, ET / 7:00-8:00 PM, PT — 60 MINUTES
8:30-9:30 PM, ET / 8:00-9:00 PM, PT — TRACKER (second season premiere)
*Common 8:00-9:00 PM timeslot begins Sunday, November 3
Associated: Poppa’s Home Season 1 – Every part We Know So Far
9:30-10:30 PM, ET / 9:00-10:00 PM, PT — THE EQUALIZER (fifth season premiere)
*Common 9:00-10:00 PM timeslot begins Sunday, November 3
As beforehand introduced, the returning sequence THE AMAZING RACE and the brand new sequence WATSON and HOLLYWOOD SQUARES are at present deliberate for the second half of the 2024-25 broadcast season.
And there you may have it. Share your ideas on this considerably disappointing, thrilling information beneath!